Project #2008377 VIDEO PRODUCTION SYSTEM
Section 11130 (or 27 41 30)
Page 7
Video Production Redesign FBC Highland Park
Landover, Indiana
10/07/2013
PRODUCTS
2.1 UNAUTHORIZED MATERIALS
Materials and products required for work of this section will not contain asbestos, polychlorinated biphenyls
(PCB) or other hazardous materials identified by the General Contractor.
All devices and control stations will be UL Certified with attached identification label. If any equipment used
is not UL Certified, then the Contractor will arrange onsite inspections and certification at no additional
expense to the Owner.
2.2 ACCEPTABLE MANUFACTURERS
Model numbers and manufacturers included in this specification are listed as a standard of quality.
Consultant will consider other qualified manufacturers subject to review. The Contractor will supply
complete technical data specifications at the time of proposed substitution. The Contractor will arrange for
product demo at the request of the Consultant or Owner Representative and will pay ground freight shipping
to and from site, or to and from Consultant’s office. The Owner, General Contractor, and the Consultant
reserve the right to accept or refuse any substitution without condition.
Substitutions: Formally request and submit a project substitution form for review. Any proposed
substitutions must meet all specifications of the specified equipment. No product substitution shall be
accepted without written approval from the Consultant. The Contractor shall remove all unauthorized
substitutions, procure, replace, and reinstall the specified product with no additional request for payment.
If product is discontinued and/or no longer publicly advertised as a part of a manufacturer’s current product
line-up at time of installation, the project team reserves the right to request a substitution of product for new
and currently offered product of like function fulfilling the design intent. Substitution value will be based on
fair market value of original product at time of bid.
2.3 GENERAL
All equipment supplied will be new and meet the latest published specifications of that product. Take care
during installation to prevent scratches, dents, chips, etc.
Safe and protected storage will be the responsibility of The Contactor. The owner takes no responsibility
for damage or theft relating to negligence in failure to secure equipment by The Contractor. If secure on-
site storage cannot be arranged with the owner, it will be The Contractors responsibility to procure portable
on-site storage. This is highly recommended.
Shipping and Handling.
Handle and ship in accordance with manufacturer’s recommendation.
Provide protective covering during construction/installation to prevent damaging or entrance of foreign
matter.
Replace at no expense to Owner, product damaged during delivery, storage or handling.
Final quantities of all equipment will be determined by The Contractor in collaboration with and approval by
the Owner.
The contractor shall not break down or throw away any boxes or associated packing material without the
permission of the owner, and only after each system and component has been commissioned by Acoustic
Dimensions. It is recommended that one box of each type of equipment be kept for shipping purposes.